Our Dept
Getting Around The Port
Organizations
About the Port
Port News
Supplemental Information for Port of New Bedford Proposals
American Recovery and Reinvestment Act
TIGER Grants for Surface Transportation: DTOS59-09-RA-TIGER
Grant Proposal
Project Cost Table
Job Creation Table
Cost-Benefit Analysis Backup
Aerial Map citing all project components
Aerial Map with Regional Perspective
Project Engineering
1. Pier Rehabilitation:
Condition Survey, Repair Work, Budget
2. Pier Expansion
Engineering Study
Rendering
3. Offloading Bulkhead:
Condition Survey
Rendering
4. Reclamation Center
Rendering
Grant Proposal
Project Cost Table
Job Creation Table
Cost-Benefit Analysis Backup
*
Wage Benefit 1
*
Wage Benefit 2
*
Truck CO2
*
Wind Farm CO2
Aerial Map citing all project components
Regional Aerial Map with Regional Perspective
Project Engineering
1.North Terminal:
Rendering
2. Rail Link to State Pier
Rendering
Rail Connector Figures
3. Road Repairs:
Rendering
Aerial
4. Cranes and Ro-Ro Ramp
Ro-Ro Rendering
Crane Picture 1
Crane Picture 2
Crane Picture 3
5. Renewable Energy Marine Park
Rendering of development
Aerial Maps of development
Aerial maps of access to proposed wind farms
Freight Flow Figure for domestic Trade
Freight Flow Figure for international Trade
Aerial Map with Regional Perspective for American Marine Highway Trade
US Rail Links to New Bedford
US Highway Connections to New Bedford
US Air Connections to New Bedford
Harbor Plan
New Bedford as a Free Trade Zone
Commercial Fishing Fleet Berthing Plan
Ocean Management Act
Potential Economic Effects of Dredging New Bedford Harbor
Economic Impact Analysis - Cape Wind Project
Port Pairing Study for New Bedford
New Bedford Tourism Summit
New Bedford Master Plan
Hicks-Logan-Sawyer Master Plan
Market & Economic Analysis Study
Economic Development Strategy for Downtown New Bedford
Acushnet Avenue Corridor Vision Plan
Fairhaven Mills Report
Upper Harbor Community Visioning Project
New Bedford – Woods Hole Ferry Pilot Project
Rail Connection Presentation
PWEDA of 1965
Phase I –Contract Docs
Phase I – Specs
Phase II – Part 1 Plans
Phase II – Part 1 Specs
Phase II – Part 1 Side Scan
Phase II – Part 2 Plans
Phase II – Part 2 Specs
Phase II – Part 2 Side Scan
Phase II – Post Dredge Report
Phase III – Top of CAD Plans
Phase III – Top of CAD Specs
Phase III – BOC Plans
Phase III – BOC Specs
Phase III – Part A Plans
Phase III – Part A Specs
Phase III – Part B Plans
Phase III – Part B Specs
Port Activity
Shipping Logistics
Cruise Facility Information
Port Directory
Newsletter
About the Port of New Bedford
Links
Maritime Terminal
American Cruise Lines
New England Fast Ferry
Cuttyhunk Ferry
Whaling City Seafood Display Auction
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com