Overview
Department Head: Ronald H. Labelle
Commissioner

The Department of Public Infrastructure, established in 2003, was the formation of a single construction element for all underground utilities within the City properties and street layouts. The Department was reorganized from the original DPW to eliminate redundant activities from the Water Department, Highways Department, and former Wastewater Division.

The combining of these utilities ultimately resulted in a $1.6 million dollar savings by combining resources into one department, increasing efficiencies while reducing overheads.

The Department of Public Infrastructure consists of four divisions; water, wastewater, highways and engineering.  The water an wastewater divisions are both enterprise funds and are successfully self supported through sewer and water fees.  The highways and engineering divisions are general fund obligation and are funded through the City's tax levy.

The primary focus & responsibilities of the Department's four divisions are listed under their separate categories.



Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.comJavascript DHTML Drop Down Menu Powered by dhtml-menu-builder.comJavascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com