Fee Schedule
Fee Schedule Effective June 1, 2016
PERMIT TYPE |
FEE |
Smoke Detector – One and Two Units | $50.00 |
Each Additional Unit | $25.00 ($500 maximum) |
Welding Permits | $50.00 |
Cannon Display | $50.00 |
Blasting Permit | $50.00 |
Oil Burner Permit | $50.00 |
Hydrogen Storage | $50.00 |
LPG Storage | $50.00 |
Model Rockets | $15.00 |
Removal of Tanks | |
– Underground | $125.00 |
– Above Ground | $75.00 |
Installation of Tanks | |
– Underground | $150.00 |
– Above Ground | $75.00 |
Smokeless or Black Powder Permit | $50.00 |
Tent | $20.00 |
Fire Reports | $10.00 |
Fireworks | $50.00 |
Tank Truck Inspections | $100.00 |
Fumigation and Fogging Permit | $50.00 |
Circus or Carnival | $50.00 |
Tank Registration Fee | $50.00 |
Sprinkler and Kitchen Suppression Permit | $50.00 |
Forms 33C & 33D | $5.00 |
Site Assessment (21E) | $35.00 |
Quarterly Inspection | $100.00 |
Dumpster Permit | $50.00 |
Maintain and Store Combustibles | $50.00 |
Annual Inspections | $25.00 |
Fire Alarm Modification | $35.00 |
Hazardous Materials | $50.00 |
Slurry Fill/AST/UST | $50.00 |
Unvented Natural or LP Gas Heaters | $50.00 |
Ventless Fireplace | $50.00 |
Fire Alarm Access Fee | $200.00 |
Kilns | $50.00 |
Floor Finishing or Refinishing | $50.00 |
Chapter 304 Permits (Liquor Licenses) | $50.00 |
Municipally Connected Fire Alarm Systems | |
-Master Box Annual Fee | $100 |
-Master Box Service Charges | $35 to fees/ min 1 hr |
-Installation of Municipal Circuits | Cost of Time and Materials |
-Review of Plans/Prints/Specification | $35 per hour/$100 minimum |
-Central Station False Alarms | $25 |
System Tests | |
-Systems Testing | $35 to fees/ min 1 hr |
-Addressable Systems | $70 to fees/ min 1 hr |
-Permit Inspection (in required) | $25 |
Other | |
Re-Inspection Fee | 100% of fee |
For HOURLY services provided on weekends, holidays, or after 4:00 PM Weekdays | Add $50 to fees. minimum 3 hours |
For inspections and services on weekends, holidays, or after 4:00 PM on weekday | Add $100 to fee per inspector |